MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 98 of 188
e. Hoses and fluid lines. f. Perform Power indication checks. g. Check for fault messages, and BIT lights failures. h. Each malfunction, tests or inspections should be performed in the order listed. i. During troubleshooting, check electrical cable loosen or broken connectors and bents pins before replacing component. 2. Repair or replace the faulty component. a. Follow all maintenance procedures. b. The schematics should be used to assist in performing system analysis on MLRS. c. Perform repair or replace component procedures prescribed in the applicable technical manuals. 3. Verify the MLRS launcher is operational. 4. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a system analysis on the MLRS and identified the _____ _____ faulty component. 2. Repaired or replaced the faulty component. _____ _____ 3. Verified that the MLRS was operational. _____ _____ 4. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-647-13&P TM 9-1425-648-13&P TM 9-243 3-68 1 October 2014