MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 95 of 188
STP 9-94P1-SM-TG e. Hoses and fluid lines 2. Perform troubleshooting procedures on the launcher drive system and isolate the malfunction to a faulty component. Check for fault messages, and BIT lights failures. a. Perform Power indication checks before electrical troubleshooting begins. b. Follow the flow chart in the back of technical manual. c. The schematics should also be used to assist in rectifying a malfunction. 3. Remove the faulty component. 4. Install the replacement component. 5. Verify the launcher drive system is operational. 6. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the launcher drive system and _____ _____ corrected any defects. 2. Performed troubleshooting procedures on the launcher drive _____ _____ system and isolated the malfunction to a faulty component. 3. Removed the faulty component. _____ _____ 4. Installed the replacement component. _____ _____ 5. Verified that the launcher drive system was operational. _____ _____ 6. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. 1 October 2014 3-65