MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 93 of 188
STP 9-94P1-SM-TG Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the hoist assembly and _____ _____ corrected any defects. 2. Performed troubleshooting procedures on the hoist assembly _____ _____ and isolated the malfunction to a faulty component. 3. Removed the faulty component. _____ _____ 4. Installed the replacement component. _____ _____ 5. Verified that the hoist assembly was operational. _____ _____ 6. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-647-13&P TM 9-1425-648-13&P TM 9-243 1 October 2014 3-63