MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 83 of 188
STP 9-94P1-SM-TG Performance Measures GO NO-GO 1. Performed a visual inspection of the cage assembly and _____ _____ corrected any defects. 2. Removed two screws four washers and two nuts securing _____ _____ U clamp to L Clamp. 3. Removed two screws and washers securing L clamp to turret. _____ _____ 4. Removed cable clamp securing ground strap. _____ _____ 5. Removed cage down limit switch from limit switch bracket. _____ _____ 6. Removed Jury Struts. _____ _____ 7. Manually lower cage. _____ _____ 8. Removed elevation resolver door assembly. _____ _____ 9. Scribed transducer shaft mounting brackets. _____ _____ 10. Removed the transducer shaft-mounting bracket. _____ _____ 11. Removed power harness door. _____ _____ 12. Used cross tip screwdriver to unlatch stud securing _____ _____ harness, two studs securing wire harness door assembly, and open armor door and PDB door assembly. 13. Removed all cable clamps, grounding straps, and cable _____ _____ ties securing the W305, W306, W307, W318 , W14 , W340 , and W81 to the cage structure. 14. Prepared the cage for removal. _____ _____ 15. Performed maintenance inspection procedures. _____ _____ 16. Installed the cage assembly. _____ _____ 17. Disconnected hoisting sling from wrecker. _____ _____ 18. Routed, reinstalled and tighten all cables, wire harness, _____ _____ transducer shaft brackets, elevation resolver door assembly, and ensured LM operated and stowed smoothly. 1 October 2014 3-53