MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 82 of 188
a. Route W305, W306, W307, W318 and W81and ground strap through hole in rear of cage. b. Route W340 and W14 through cable troughs on right bottom of cage to the PDB. c. Route W305, W306, W307, and W318 and W81 up the side of the PNU compartment. d. Reconnect cables to their LRU's. e. Install all cable clamps and cable ties securing the W340, W14, W305, W306, W307, W318, and W81 to the cage structure. f. Install grounding strap. g. Close and latch PDB/SNVT and FCU/SRP door assemblies. h. Install and secure wire harness door assembly by latching studs. (1) Close and secure RP connector right hand door assembly and harness trough door assembly. (2) Secure four latching studs, install power harness door assembly. i. Install the transducer shaft bracket. (1) Slide clamp onto transducer shaft. (2) Tighten clamp screw. (3) Adjust transducer. (4) Install the elevation resolver door assembly door to cage. (5) Install the WIU/PNU and PDB doors. j. Install the cage down limit switch. k. Using the BC to extend and retract boom two times. l. Check for smooth operation, and stow LM. 19. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. 3-52 1 October 2014