MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 81 of 188
STP 9-94P1-SM-TG e. Remove grounding strap. f. Pull cables and grounding strap from cage and place in vehicle bed. 14. Prepare the cage for removal. a. Connect the hoisting sling to cage. b. Remove the left and right elevation actuator upper bolts and washers. c. Manually lower actuators to rest on elevation actuator supports. d. Release pressure on pivot bolts, lift cage at rear with screw jacks. e. Remove hardware securing pivot fitting to turret pivot lugs. f. Lift and lower cage onto a suitable support area to prevent damage to cage compartments. g. Lift, lower actuators off supports, and lay supports on turret and then lower actuators on supports. 15. Perform maintenance inspection procedures. 16. Install the cage assembly. a. Lift elevation actuators and install supports. b. Measure and note dimension between turret pivot lugs. c. Slowly lower the cage and align pivot fittings in turret pivot lugs. d. Using screw jacks, line up bolt holes in pivot fitting with holes in turret pivot lugs and install bolts. e. Tighten nut until dimension at point marked between turret pivot lugs is 0.18mm (0.007 inch) less than the dimension noted in earlier step. 17. Disconnect hoisting sling from wrecker. a. Remove sling from cage. b. Remove jacks, guidelines, and wooden supports. 18. Install the cable as follows: 1 October 2014 3-51