MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download

Page 77 of 188

STP 9-94P1-SM-TG 2. Remove the faulty hoist hook and pulley assembly. Remove the following items: a. Pulley assembly. b. RP hoist hooks. c. Lock spring. d. Lock assembly. e. Spacer assembly. f. Splice Plate. g. Spreader assembly. h. Handle Assembly. 3. Install the hoist hook and pulley assembly. Install the following items: a. Handle Assembly. b. Spreader assembly. c. Splice Plate. d. Spacer assembly. e. Lock assembly. f. Lock spring. g. RP hoist hooks. h. Pulley assembly. i. Verify the hoist hook and pulley assembly is operational. Perform load test after repair. 4. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the hoist hook and pulley _____ _____ assembly and corrected any defects. 1 October 2014 3-47