STP 9-94P1-SM-TG e. Remove the jam nut and lock washer. 2. Remove the faulty hoist-up limit switch. 3. Install the replacement hoist-up limit switch. a. Install the jam nut and lock washer. b. Connect the electrical connector to limit switch. c. Turn on system power. 4. Adjust the hoist-up limit switch. 5. Verify the hoist-up limit switch is operational. 6. Complete maintenance forms, if required. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the hoist-up limit switch and _____ _____ corrected any defects. 2. Removed the faulty hoist-up limit switch. _____ _____ 3. Installed the replacement hoist-up limit switch. _____ _____ 4. Adjusted the hoist-up limit switch. _____ _____ 5. Verified that the hoist-up limit switch was operational. _____ _____ 6. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 EM 0208 TM 9-243 1 October 2014 3-45