MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 73 of 188
STP 9-94P1-SM-TG Performance Measures GO NO-GO 2. Removed the link assembly from the rocket pod latch-hook _____ _____ assembly. 3. Removed the faulty rocket pod latch-hook assembly. _____ _____ 4. Installed the replacement rocket pod latch-hook assembly. _____ _____ 5. Performed rigging gauge adjustment. _____ _____ 6. Connected the link assembly to the rocket pod latch-hook assembly. _____ _____ 7. Operated the latch handle to ensure a smooth operation. _____ _____ 8. Verified that the rocket pod latch-hook assembly was operational. _____ _____ 9. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-647-13&P TM 9-243 1 October 2014 3-43