MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download

Page 69 of 188

STP 9-94P1-SM-TG d. Electrical cables and connectors. e. Hoses and fluid lines. 2. Remove the W75 or W76 cable assembly. a. Temporarily install forward end beam. b. Remove the boom extension actuator. c. Remove the C-clamps securing the intermediate beam to fixed beam. d. Remove the upper guide roller for W75 or W76 cable. e. Remove the W75 or W76 cable. 3. Remove the defective intermediate beam. a. Pull the intermediate beam out of fixed beam. b. Inspect the beam slide buttons. c. Inspect the separator strip on fixed beam. 4. Install the intermediate beam. a. Slide the intermediate beam into fixed beam until pinion gear is just forward of fixed beam rack gear. b. Remove the forward end beam. c. Install the hoist carriage. 5. Install the W75 or W76 cable assembly. 6. Verify the intermediate beam is operational. 7. Complete the required maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Setup: Have the hoist carriage removed (Task 091-94P-1071). Performance Measures GO NO-GO 1. Performed a visual inspection of the intermediate beam and _____ _____ corrected any defects. 1 October 2014 3-39