MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 67 of 188
STP 9-94P1-SM-TG Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the rocket pod hoist carriage _____ _____ assembly and corrected any defects. 2. Extended the intermediate beam manually. _____ _____ 3. Removed the boom extension actuators. _____ _____ 4. Removed the flexible cable. _____ _____ 5. Secured the intermediate beams in position. _____ _____ 6. Installed hoist carriage assembly. _____ _____ 7. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-647-13&P TM 9-243 1 October 2014 3-37