MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download

Page 65 of 188

STP 9-94P1-SM-TG b. Bearings and bushings. c. Components. d. Electrical cables and connectors. e. Hoses and fluid lines. 2. Extend the intermediate beam manually. a. Extend the intermediate beam on boom not being repaired to acquire the access holes in fixed beam. b. Extend the intermediate beam on boom with defective carriage until intermediate beam and cage outer plate is aligned with access hole in fixed beam and cage outer plate. c. Remove the following items: (1) Inboard retaining ring from roller axle. (2) Roller through the top access hole. (3) Forward tube support assembly to bracket. (4) Ball nut drive assemblies to the intermediate beam. (5) Forward end beam assembly, spacers, and shims. (6) Electrical cable from hoist electrical control box connector J1. 3. Remove the boom extension actuators. 4. Remove the flexible cable. a. Remove the flexible cable bracket to hoist support. b. Remove the flexible cable from hoist support. 5. Secure the intermediate beams in position. a. Secure the intermediate beam using a C-clamp. b. Remove the hoist carriage from the intermediate beam. 6. Install hoist carriage assembly. a. Lift the carriage into position and pull carriage rails into intermediate beam. 1 October 2014 3-35