MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 59 of 188
STP 9-94P1-SM-TG 2. Remove the faulty hoist-down limit switch. 3. Install the replacement hoist-down limit switch. a. Screw the switch into mount only far enough to hold it in mount before adjustment. b. Install the ground wire. 4. Adjust the hoist-down limit switch. a. Connect limit switch cable to hoist breakout box. b. Connect the multi-meter. c. Rotate switch mount. d. Lock wire limit switch and switch mount jam nuts together. e. Reconnect the limit switch connector P1. 5. Verify the hoist-down limit switch is operational. 6. Fill out maintenance forms, if required. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the hoist-down limit switch and _____ _____ corrected any defects. 2. Removed the faulty hoist-down limit switch. _____ _____ 3. Installed the replacement hoist-down limit switch. _____ _____ 4. Adjusted the hoist-down limit switch. _____ _____ 5. Verified that the hoist-down limit switch was operational. _____ _____ 6. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. 1 October 2014 3-29