MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 57 of 188
STP 9-94P1-SM-TG Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the cage-down limit switch and _____ _____ corrected any defects. 2. Installed the jury struts. _____ _____ 3. Removed the faulty cage-down limit switch. _____ _____ 4. Installed the replacement cage-down limit switch. _____ _____ 5. Adjusted the cage-down limit switch. _____ _____ 6. Verified that the cage-down limit switch was operational. _____ _____ 7. Installed the cover. _____ _____ 8. Installed the four bolts washer securing limit switch cover. _____ _____ 9. Removed the jury struts. _____ _____ 10. Cycled the rocket launcher in elevation. _____ _____ 11. Performed stow procedures. _____ _____ 12. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-647-13&P TM 9-243 1 October 2014 3-27