MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 54 of 188
Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the elevation actuator-support _____ _____ assembly and corrected any defects. 2. Installed the jury struts. _____ _____ Note: If the jury struts cannot be installed, support the cage with the wrecker and the hoisting sling. 3. Removed the elevation drive propeller shaft. _____ _____ 4. Removed the splined yoke. _____ _____ 5. Removed the faulty elevation actuator-support assembly. _____ _____ 6. Installed the replacement elevation actuator-support assembly. _____ _____ 7. Installed the splined yoke. _____ _____ 8. Installed the elevation drive propeller shafts. _____ _____ 9. Verified that the elevation actuator-support assembly was _____ _____ operational. 10. Removed the jury struts. _____ _____ 11. Cycled the rocket launcher in elevation. _____ _____ 12. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-647-13&P TM 9-243 3-24 1 October 2014