MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 47 of 188
STP 9-94P1-SM-TG Performance Measures GO NO-GO 9. Removed elevation transmission. _____ _____ 10. Removed the turret base assembly. _____ _____ 11. Attached the hoisting sling. _____ _____ 12. Lowed the turret onto suitable support. _____ _____ 13. Inspected the felt seal on base assembly. _____ _____ 14. Attached the guide lines. _____ _____ 15. Aligned the index mark on base assembly. _____ _____ 16. Installed 48 bolts and washers. _____ _____ 17. Disconnected the hoisting sling from wrecker. _____ _____ 18. Positioned swivel and ensure four bolts/washers are tight. _____ _____ 19. Installed elevation transmission. _____ _____ 20. Installed elevation motor. _____ _____ 21. Installed the ground strap and driver for electrical bond. _____ _____ Ensure swivel and two bolts are secure. 22. Connected the elevation motor, return, and transmission brake _____ _____ hydraulic lines. 23. Installed the ground strap. _____ _____ 24. Installed the cable bundle through turret. _____ _____ 25. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 1 October 2014 3-17