MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 46 of 188
b. Return. c. Transmission brake. 23. Install the ground strap. a. Install strap. b. Tighten bolts and nuts. 24. Install the cable bundle through turret. a. Connect the W14P2 connector. b. Connect the W340P4 and W340P5 cable (M270A1). c. Connect the W23P5 cable (M270). 25. Fill out maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Note: Setup, Have the cage assemblies removed (Task 091-94P-1074) and the elevation transmission removed. Performance Measures GO NO-GO 1. Performed a visual inspection of the turret assembly and corrected any defects. _____ _____ 2. Rotated the turret manually until the 1.25-degree limit switch was free. _____ _____ 3. Made an index mark on the turret and one on the base. _____ _____ 4. Removed the cable bundle from the turret. _____ _____ 5. Disconnected the W14P2 connector. _____ _____ 6. Removed the ground strap by loosening bolts and nuts. _____ _____ 7. Removed the swivel and ensure elevation motor, return, and _____ _____ transmission brake hydraulic lines are disconnected. 8. Removed elevation motor. _____ _____ 3-16 1 October 2014