MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download

Page 45 of 188

STP 9-94P1-SM-TG 8. Remove Elevation Motor. 9. Remove Elevation Transmission. 10. Remove the turret from the base assembly. Remove the 48 bolts and washers from the turret. 11. Attach the hoisting sling. a. Connect wrecker hook to turret sling. b. Attach four guide lines. 12. Lower the turret onto a suitable support to prevent damage to cage components. 13. Inspect the Felt Seal on base assembly. 14. Assemble sling with longer cables to front and shorter cable to rear. a. Connect wrecker hook to turret sling. b. Lift and position turret on base assembly. 15. Align the index mark on turret with index mark on base assembly. 16. Install 48 bolts and washers. 17. Disconnect the hoisting sling from wrecker. Remove sling from turret. 18. Position swivel to swivel support. a. Install four bolts and washers. b. Tighten bolts. 19. Install Elevation Transmission. 20. Install Elevation Motor. 21. Install the ground strap and driver for electrical bond. a. Install swivel with two bolts and two washers. b. Tighten bolts. 22. Connect the hydraulic hoses. a. Elevation motor supply. 1 October 2014 3-15