MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 40 of 188
091-94P-1051 Maintain Launcher Mechanical System DANGER Follow all Danger warning in TMs WARNING Follow all warning in TMs CAUTION When removing the draw bolts record the number of washers between the adjusting nut and the ADU. Retain these washers for installation of the new ADU. They establish a measurement required for ADU operation. Conditions: Perform this task in a operational environment given an armored vehicle- mounted M270A1 rocket launcher; an faulty Improved Launcher Mechanical System; DA Form 2404, Equipment Inspection and Maintenance Worksheet; one 94P MLRS repairer; one 13M MLRS crewmember; and one 13T field artillery surveyor to assist as required; 94P shop set and a 94P tool kit; a survey’s theodolite; TM 9-1055-647-13&P; TM 9-243; and a DA Pamphlet 750-8, The Army Maintenance Management System (TAMMS) Users Manual. Note: This task may be performed in a Chemical, Biological, Radiological, and Nuclear (CBRN) environment. Standards: Maintenance on the Improved Launcher Mechanical System was performed according to the applicable technical manuals. Perform this task without causing injury to self, other personnel, the environment, or damage to equipment. Special Condition: None Special Standards: None Special Equipment: Cue: None Note: None Performance Steps 1. Perform a visual inspection of the Improved Launcher Mechanical System. a. Remove azimuth brake. b. Remove brake from ADU and position out of the way for ADU removal. 3-10 1 October 2014