MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 33 of 188
STP 9-94P1-SM-TG Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the elevation position monitor _____ _____ transducer and corrected any defects. 2. Performed a visual inspection of the elevation position monitor _____ _____ transducer and corrected any defects. 3. Installed the replacement elevation position monitor transducer. _____ _____ 4. Adjusted the elevation position monitor transducer. _____ _____ 5. Verified that the elevation position monitor transducer was _____ _____ operational. 6. Cycled the rocket launcher in elevation. _____ _____ 7. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO, if all performance measures are passed (P). Score the soldier NO-GO, if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-647-13&P TM 9-243 1 October 2014 3-3