MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 176 of 188
6. Verify the FCS is operational. 7. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the Fire Control System and _____ _____ corrected any defects. 2. Performed repair procedures with the Maintenance _____ _____ Manager/Launcher Adapter Group and isolated the malfunction to a faulty component. 3. Used IETM as a guide for performing tests within CBIT and _____ _____ MM/LAG. 4. Removed the faulty component(s). _____ _____ 5. Installed the replacement component(s). _____ _____ 6. Verified that the FCS was operational. _____ _____ 7. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-1646-13&P TM 9-243 3-146 1 October 2014