MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download

Page 173 of 188

STP 9-94P1-SM-TG 4. Remove the faulty jury strut in accordance with TM 9-1055-1646-13&P. 5. Install the jury strut in accordance with TM 9-1055-1646-13&P. 6. Install the retaining ring and pin attached to lower link arm assembly. 7. Install the threaded pin that secure the jury strut to LM. 8. Verify the jury strut is operational. 9. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the jury strut and corrected _____ _____ any defects. 2. Removed the threaded pin that secured the jury strut to LM. _____ _____ 3. Removed the retaining ring and pin attached to lower link arm _____ _____ assembly. 4. Removed the faulty jury strut. _____ _____ 5. Installed the replacement jury strut. _____ _____ 6. Installed the retaining ring and pin attached to lower link arm assembly. _____ _____ 7. Installed the threaded pin that secured the jury strut to LM. _____ _____ 8. Verified that the jury strut was operational. _____ _____ 9. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 1 October 2014 3-143