MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 171 of 188
STP 9-94P1-SM-TG d. Initiate CBIT procedure. 3. Repair the faulty component in accordance with TM 9-1055-1646-13&P. 4. Verify the HIMARS is operational. 5. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a system analysis on the HIMARS and identified the _____ _____ faulty component. 2. Performed Power indication check, Initialize the FCS, Reload _____ _____ Operation, and Initiate CBIT procedure in order. 3. Repaired the faulty component. _____ _____ 4. Verified that the HIMARS was operational. _____ _____ 5. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-1646-13&P TM 9-243 1 October 2014 3-141