MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 168 of 188
17. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the platform and corrected any _____ _____ defects. 2. Opened air tanks to bleed valve on hydraulic Reservoir. _____ _____ 3. Removed the azimuth resolver. _____ _____ 4. Returned the LM to approximately 0 mils azimuth. _____ _____ 5. Removed the azimuth geared bearing dust seals. _____ _____ 6. Removed the upper hydraulic swivel mount. _____ _____ 7. Unlocked both the curbside and roadside elevation travel locks. _____ _____ 8. Installed the hoisting sling to forward floor beam assembly. _____ _____ 9. Used wrecker, to slowly raise LM clear of two Turrets _____ _____ Installation guide pins and lower onto dunnage. 10. Verified the platform and turret assembly was installed correctly. _____ _____ 11. Inspected the azimuth geared bearing and azimuth drive pinion. _____ _____ 12. Installed the azimuth geared bearing dust seals. _____ _____ 13. Installed the azimuth resolver. _____ _____ 14. Installed bolts, hoses, ground straps, and routing of cables as _____ _____ recorded during removal. 15. Performed all procedures in order indicated in accordance _____ _____ with TM 9-1055-1646-13&P and TM 9-2300-310-14P. 16. Performed FCS AFTER MAINTENANCE FOLLOW-ON _____ _____ procedures. 17. Completed maintenance forms, if required. _____ _____ 3-138 1 October 2014