MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download

Page 167 of 188

STP 9-94P1-SM-TG 5. Remove the azimuth geared bearing dust seals in accordance with TM 9-1055-1646- 13&P. 6. Perform removal of upper hydraulic Swivel mount in accordance with TM 9-1055- 1646-13&P. 7. Manually unlock both elevation travel locks. 8. On Platform Assembly, install hoisting sling to forward Floor Beam Assembly. a. Attach opposite end of sling to wrecker and remove slack from hoisting sling. Use wrecker and raise forward end of Platform Assembly until both Jury Struts can be deployed. b. In accordance with TM 9-1055-1646-13&P continue the removal, routing of cables, disconnecting of hoses and raising of the Elevation Actuator in support of removing Platform. 9. Using wrecker, slowly raise LM clear of two Turret installation guide pins. Position LM clear of vehicle and lower onto dunnage. 10. Install Platform Assembly: a. Verify attachment of LM hoisting sling and four guide ropes to LM. Using wrecker, position LM over top of Turret installations guide pins and onto Azimuth Geared Bearing. b. Position lifting sling around upper end of Elevation Actuator. Ensure sling is not positioned over Elevation Actuator hydraulic tube. Complete the installation in accordance with TM9-1055-1646-13&P. 11. Inspect the azimuth geared bearing and azimuth drive pinion gear. 12. Install the azimuth geared bearing dust seals in accordance with TM 9-1055-1646- 13&P. 13. Install the azimuth resolver in accordance with TM 9-1055-1646-13&P. 14. Install bolts, hoses, ground straps, and routing of cables as recorded during removal, in accordance with TM 9-1055-1646-13P. 15. Perform all procedures in order indicated in accordance with TM 9-1055-1646- 13&P, TM 9-2300-310-14P. 16. Perform FCS AFTER MAINTENANCE FOLLOW-ON procedures in accordance with TM 9-1055-1646-13&P. 1 October 2014 3-137