MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 162 of 188
3. Remove the faulty limit switch in accordance with TM 9-1055-1646-13&P. 4. Install the limit switch in accordance with TM 9-1055-1646-13&P. 5. Adjust the limit switch in accordance with TM 9-1055-1646-13&P. 6. Retract the jury struts. 7. Verify the limit switch is operational. 8. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the limit switches and corrected _____ _____ any defects. 2. Deployed the jury struts. _____ _____ 3. Removed the faulty limit switch. _____ _____ 4. Installed the replacement limit switch. _____ _____ 5. Performed the limit switch adjustment. _____ _____ 6. Verified that jury struts are retracted. _____ _____ 7. Verified that the limit switch was operational. _____ _____ 8. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-1646-13&P TM 9-243 3-132 1 October 2014