MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 160 of 188
e. hoses and fluid lines. 2. Isolated the malfunction to a faulty component in accordance with TM 9-1055-1646- 13&P. 3. Remove the faulty component in accordance with TM 9-1055-1646-13&P. 4. Install the replacement component in accordance with TM 9-1055-1646-13&P. 5. Verify the elevation hydraulic manifold is operational. 6. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the Elevation Hydraulic _____ _____ Manifold and corrected any defects. 2. Performed troubleshooting procedures and isolated the _____ _____ malfunction to a faulty component. 3. Removed the faulty component. _____ _____ 4. Installed the replacement component. _____ _____ 5. Verified that the elevation hydraulic manifold was operational. _____ _____ 6. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-1646-13&P TM 9-243 3-130 1 October 2014