MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download

Page 156 of 188

3. Select the maintenance (PFK) function and press the CONFIRM PFK to enter Maintenance Manager Menu in accordance with TM 9-1055-1646-13&P. 4. Verify the Maintenance Manager is operational. 5. Power down the Maintenance Manager in accordance with TM 9-1055-1646-13&P. 6. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the system power level. _____ _____ 2. Performed Fire Control System initialization and started the _____ _____ Commanded Built-In Test (CBIT) process. 3. Selected the maintenance (PFK) function and press the _____ _____ CONFIRM PFK to enter Maintenance Manager Menu. 4. Verified that the Maintenance Manager was operational. _____ _____ 5. Performed Power down procedures for the Maintenance _____ _____ Manager. 6. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-1646-13&P TM 9-243 3-126 1 October 2014