MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 154 of 188
Performance Measures GO NO-GO 4. Recorded the number of washers and washer location for _____ _____ installation. 5. Removed the azimuth drive unit. _____ _____ 6. Installed the azimuth drive unit. _____ _____ 7. Installed the six jack-bolts into the super-bolt until each _____ _____ jack-bolt is flush with super-bolt mounting surface. Ensured the super-bolts does not extend beyond mounting surface of the super-bolts. Repeat the procedure for the remaining three super-bolts. 8. Rotated the ADU azimuth manual drive input and two _____ _____ turret-to-azimuth gearing mounting bolts until high point of ADU pinion gear (X) is aligned between high points (X) on azimuth geared bearing. 9. Pushed the ADU forward against azimuth geared bearing _____ _____ aligning X mark of pinion rear between two X marks on geared bearing. Position ADU so vertical mounting surfaces of ADU are parallel (evenly spaced) to mounting surfaces or the base assembly. 10. Installed and torque all bolts. _____ _____ 11. Ensured the system was operating properly. _____ _____ 12. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-1646-13&P TM 9-243 3-124 1 October 2014