MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download

Page 148 of 188

d. electrical cables and connectors. e. hoses and fluid lines. 2. Remove the defective intermediate beam in accordance with TM 9-1055-1646-13&P. 3. Install the intermediate beam in accordance with TM 9-1055-1646-13&P. 4. Verify the intermediate beam is operational. 5. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Setup: Have the hoist carriage removed. Performance Measures GO NO-GO 1. Performed a visual inspection of the intermediated beam and _____ _____ corrected any defects. 2. Removed the defective intermediate beam. _____ _____ 3. Installed the replacement intermediate beam. _____ _____ 4. Verified that the intermediate beam was operational. _____ _____ 5. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-1646-13&P TM 9-243 3-118 1 October 2014