MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download

Page 147 of 188

STP 9-94P1-SM-TG 091-94P-1212 Replace the Boom Intermediate Beams DANGER Follow all danger warning in TMs WARNING Follow all warning in TMs CAUTION Comply with all unit/shop SOPs Conditions: Perform this task in a operational environment given an armored vehicle- mounted M142 HIMARS launcher; a faulty intermediate beam; DA Form 2404, Equipment Inspection and Maintenance Worksheet; two 94P MLRS repairer; one 13M MLRS crewmember to assist as required; one M1089A1 Wrecker; one 63BH8 operator; a 94P shop set and tool kit; four 8 ft. endless nylon slings; two C-Clamp 10in.; one Depth Gauge, as Required 4-inch by 4-inch by 5-foot wood supports; TM 9-1055-1646- 13&P; TM 9-243, and a DA Pamphlet 750-8 The Army Maintenance Management System (TAMMS) Users Manual. Note: This task may be performed in a Chemical, Biological, Radiological, and Nuclear (CBRN) environment. Standards: The intermediate beam is replaced according to the applicable technical manuals. Perform this task without causing injury to self, other personnel, the environment, or damage to equipment. Special Condition: None Special Standards: None Special Equipment: Cue: None Note: None Performance Steps 1. Inspect the intermediated beam and correct any defects. Check the following items below: a. bolts, nuts, and screws. b. bearings and bushings. c. components. 1 October 2014 3-117