MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download

Page 145 of 188

STP 9-94P1-SM-TG 3. Remove the faulty elevation resolver in accordance with TM 9-1055-1646-13&P. 4. Install the elevation resolver in accordance with TM 9-1055-1646-13&P. 5. Reconnect the W540P3 cable to elevation resolver J1. 6. Adjust elevation resolver and the hardware in accordance with TM 9-1055-1646- 13&P. 7. Verify the elevation resolver is operational. 8. Cycle the HIMARS launcher in elevation. 9. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the elevation resolver and _____ _____ corrected any defects. 2. Disconnected W540P3 cable from the elevation resolver J1. _____ _____ 3. Removed the faulty elevation resolver. _____ _____ 4. Installed the replacement elevation resolver. _____ _____ 5. Reconnected the W540P3 cable to elevation resolver J1. _____ _____ 6. Performed the elevation resolver alignment and hardware _____ _____ adjustment procedure. 7. Verified that the elevation resolver was operational. _____ _____ 8. Cycled the HIMARS launcher in elevation. _____ _____ 9. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. 1 October 2014 3-115