091-94P-1210 Replace the Elevation Resolver DANGER Follow all Danger warning in TMs WARNING Follow all warning in TMs CAUTION Comply with all unit/shop SOPs Conditions: Perform this task in a operational environment given an M142 HIMARS launcher; an faulty elevation resolver; DA Form 2404, Equipment Inspection and Maintenance Worksheet; one 94P HIMARS repairer and one 13M MLRS crewmember to assist as required; 94P-shop set and tool kit; lock wire; TM 9-1055-1646-13&P; TM 9- 243, and DA Pamphlet 750-8, The Army Maintenance Management System (TAMMS) Users Manual. Note: This task may be performed in a Chemical, Biological, Radiological, and Nuclear (CBRN) environment. Standards: The elevation resolver is replaced according to the applicable technical manuals. Perform this task without causing injury to self, other personnel, the environment, or damage to equipment. Special Condition: None Special Standards: None Special Equipment: Cue: None Note: None Performance Steps 1. Inspection the elevation resolver and correct any defects. a. Inspect bolts, nuts, and screws. b. Inspect bearings and bushings. c. Check components. d. Check electrical cables and connectors. 2. Disconnect W540P3 cable from the elevation resolver J1. 3-114 1 October 2014