MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 143 of 188
STP 9-94P1-SM-TG 5. Adjust the PNU mounting/ adjusting bolts in accordance with TM 9-1055-1646-13&P. 6. Torque the two nuts on the mounting/adjusting bolt in accordance with TM 9-1055- 1646-13&P. 7. Install and secure the PNU in accordance with TM 9-1055-1646-13&P. 8. Perform follow-on procedures and completed maintenance forms, if required. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the Position Navigational _____ _____ unit (PNU) Mounting/adjustment bolts. 2. Removed the PNU mounting/adjusting bolts. _____ _____ 3. Performed vehicle leveling procedures. _____ _____ 4. Installed the PNU mounting/adjustment bolts. _____ _____ 5. Adjusted the PNU mounting/ adjusting bolts. _____ _____ 6. Torqued the two nuts on the mounting/adjusting bolt. _____ _____ 7. Installed and secured the PNU. _____ _____ 8. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-1646-13&P TM 9-243 1 October 2014 3-113