MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 140 of 188
5. Visually inspect the hoist assembly for damage and cable connections, to include the BC to verify there is no damage or obstruction. 6. Extend the boom out fully. 7. Attempt to operate the hoist all the way down and all the way up. 8. Once the fault has been determined, follow the test procedures in TM 9-1055-1646- 13&P. 9. Replace faulty component in accordance with TM 9-1055-1646-13&P. 10. Cycle the HIMARS launcher boom-in/out, and the hoist down/up operation. 11. Complete maintenance forms as required. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Inspected the reload manifold and correct any defects in _____ _____ accordance with TM 9-1055-1646-13&P. 2. Isolated the exact malfunction of the hoist. _____ _____ 3. Turned the system power on and select Reload from the _____ _____ operational menu. 4. Positioned the LLM at 3200 MILS using the BC. _____ _____ 5. Visually inspected the hoist assembly for damage and cable _____ _____ connections, to include the BC to verify there is no damage or obstruction. 6. Extended the boom out fully. _____ _____ 7. Operated the hoist all the way down and all the way up. _____ _____ 8. Performed follow-on test procedures in TM 9-1055-1646-13&P. _____ _____ 9. Replaced faulty component in accordance with TM 9-1055-1646-13&P. _____ _____ 10. Cycled the HIMARS launcher boom-in/out, and the hoist _____ _____ down/up operation. 3-110 1 October 2014