MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download

Page 138 of 188

Performance Measures GO NO-GO 7. Removed the reload manifold from curbside sponson. _____ _____ 8. Installed the replacement reload manifold. _____ _____ 9. Installed the union and o-ring to the reload manifold hoist brake port. _____ _____ 10. Installed elbow assembly and coupling half to the reload _____ _____ manifold hoist brake port union. 11. Installed adapter assembly and o-ring to boom drain port. _____ _____ 12. Reconnected all the W510 cables to reload manifold. _____ _____ 13. Reconnected all the hydraulic coupling halves. _____ _____ 14. Performed a hydraulic system status check after repairs were _____ _____ completed. 15. Cycled the HIMARS launcher boom-in/out and hoist down/up operation. _____ _____ 16. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-1646-13&P TM 9-243 3-108 1 October 2014