MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 137 of 188
STP 9-94P1-SM-TG 6. Remove the union and o-ring from the reload manifold hoist brake port. 7. Remove the reload manifold from the curbside sponson. 8. Install the reload manifold in accordance with TM 9-1055-1646-13&P. 9. Install the union and o-ring to the reload manifold hoist brake port. 10. Install the elbow assembly and coupling half to the reload manifold hoist brake port union. 11. Install the adapter assembly and o-ring to the boom drain port. 12. Reconnect all the W510 cables to the reload manifold. 13. Reconnect all the hydraulic coupling halves. 14. Perform a hydraulic system status check in accordance with TM 9-1055-1646-13&P. 15. Cycle the HIMARS launcher boom-in/out, and the hoist down/up operation. 16. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the reload manifold and _____ _____ corrected any defects. 2. Disconnected hydraulic coupling halves. _____ _____ 3. Disconnected all the W510 cables from reload manifold. _____ _____ 4. Removed the adapter assembly and o-ring from boom drain port. _____ _____ 5. Removed the elbow assembly and coupling half from reload _____ _____ manifold hoist brake port union. 6. Removed union and o-ring from the reload manifold hoist brake _____ _____ port. 1 October 2014 3-107