2. Remove the hose assembly from the elevation actuator retraction port in accordance with TM 9-1055-1646-13&P. 3. Remove the joint swivel assembly and O-ring from elevation actuator extension port in accordance with TM 9-1055-1646-13&P. 4. Remove the faulty elevation actuator in accordance with TM 9-1055-1646-13&P. 5. Install the elevation actuator in accordance with TM 9-1055-1646-13&P. 6. Install the joint swivel assembly and O-ring from the elevation actuator extension port in accordance with TM 9-1055-1646-13&P. 7. Install the hose assembly from the elevation actuator retraction port in accordance with TM 9-1055-1646-13&P. 8. Verify the elevation actuator is operational. 9. Cycle the launcher in elevation. 10. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the elevation actuator and _____ _____ corrected any defects. 2. Removed the hose assembly from elevation actuator retraction _____ _____ port. 3. Removed the joint swivel assembly and O-ring from elevation _____ _____ actuator extension port. 4. Removed the faulty elevation actuator. _____ _____ 5. Installed the replacement elevation actuator. _____ _____ 6. Installed the joint swivel assembly and O-ring from elevation _____ _____ actuator extension port. 7. Installed the hose assembly from elevation actuator retraction _____ _____ port. 3-104 1 October 2014