MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 132 of 188
Performance Measures GO NO-GO 20. Performed reloader safety load test procedure. _____ _____ 21. Verified that the hoist carriage assembly was operational. _____ _____ 22. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-1055-1646-13&P TM 9-243 3-102 1 October 2014