MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 131 of 188
STP 9-94P1-SM-TG Performance Measures GO NO-GO 2. Removed the hoist cover on the hoist carriage assembly. _____ _____ 3. Removed the boom extension actuator. _____ _____ 4. Disconnected the W505P2 from hoist up limit switch J1 and _____ _____ W505P3 hoist down limit switch J1. 5. Pulled the cable guide through intermediate beam to rear of _____ _____ platform assembly. 6. Secured the intermediate beams in position. _____ _____ 7. Installed the hoist carriage assembly into intermediate beams. _____ _____ 8. Verified that the hoist carriage assembly and intermediate _____ _____ beams are properly positioned within fixed beams. 9. Performed side measurements of the intermediate beam. _____ _____ 10. Inserted the boom out stops into intermediate beams. _____ _____ 11. Positioned the hoist carriage and intermediate beam manually. _____ _____ 12. Routed the flex drive cable support, W505 cable assembly, _____ _____ and hydraulic hose through intermediate beam to hoist carriage assembly. 13. Connected coupling halves at rear of hoist assembly. _____ _____ 14. Connected the W505P2 connector to hoist up limit switch _____ _____ connector J1 and W505P3 connector to hoist down limit switch connector J1. 15. Installed the hoist cover on the hoist carriage assembly. _____ _____ 16. Installed the boom extension actuator. _____ _____ 17. Performed boom-out and boom-out operations manually. _____ _____ 18. Performed boom-in limit switch procedure. _____ _____ 19. Performed boom-out limit switch procedure. _____ _____ 1 October 2014 3-101