MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 130 of 188
5. Pull the cable guide through intermediate beam to rear of platform assembly. 6. Secure the intermediate beams in position. 7. Install the hoist carriage assembly into intermediate beams. 8. Verify the hoist carriage assembly and intermediate beam is properly positioned within fixed beams. 9. Measure both side of the intermediate beam in accordance with TM 9-1055-1646- 13&P. 10. Insert the boom out stops into intermediate beams. 11. Manually position the hoist carriage and intermediate beam. 12. Route the flex drive cable support, W505 cable assembly, and hydraulic hose through intermediate beam to hoist carriage assembly. 13. Connect the coupling halves to rear of hoist assembly. 14. Connect the W505P2 connector to hoist up limit switch connector J1 and W505P3 connector to hoist down limit switch connector J1. 15. Install the hoist cover to the hoist carriage assembly. 16. Install the boom extension actuator in accordance with TM 9-1055-1646-13&P. 17. Manually extend the boom-out and boom-in. 18. Adjust the boom-in limit switch in accordance with TM 9-1055-1646-13&P. 19. Adjust the boom-out limit switch in accordance with TM 9-1055-1646-13&P. 20. Perform the reloader safety load test in accordance with TM 9-1055-1646-13&P. 21. Verify the hoist carriage assembly is operational. 22. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the hoist carriage assembly _____ _____ and corrected any defects. 3-100 1 October 2014