MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download

Page 129 of 188

STP 9-94P1-SM-TG 091-94P-1213 Repair the Hoist Carriage Assembly DANGER Follow all Danger warning in TMs WARNING Follow all warning in TMs CAUTION Comply with all unit/shop SOPs Conditions: Perform this task in an operational environment given an M142 HIMARS launcher, hoist carriage assembly; DA Form 2404, Equipment Inspection and Maintenance Worksheet; two 94P HIMARS repairers; one 13M MLRS crewmember to assist as required; a M1089A1wrecker and an operator; a 94P tool kit; a manila rope; TM 9-1055-1646-13&P; TM 9-243, and a DA Pamphlet 750-8, The Army Maintenance Management System (TAMMS) Users Manual. Note: This task may be performed in an Chemical, Biological, Radiological, and Nuclear (CBRN) environment. Standards: The hoist carriage assembly was repaired according to the applicable technical manuals. Perform this task without causing injury to self, other personnel, the environment, or damage to equipment. Special Condition: None Special Standards: None Special Equipment: Cue: None Note: None Performance Steps 1. Perform a visual inspection of the hoist carriage assembly and correct any defects. Inspect hoist carriage rack gears and intermediate beam pinion gear. 2. Remove hoist cover from hoist carriage assembly. 3. Remove the boom extension actuator. 4. Disconnect the W505P2 from hoist up limit switch J1 and W505P3 hoist down limit switch J1. 1 October 2014 3-99