MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download

Page 127 of 188

STP 9-94P1-SM-TG 2. Position the HIMARS launcher. a. Make sure launcher is on firm flat level ground. b. LM is positioned at 3200 Mils Azimuth, 0 Mils in Elevation. c. Positioned LM with towing pintle in line with center of test load, with rear bumper approximately five feet from test load. 3. Inspect the hoist cables. 4. Perform the load test in accordance with TM 9-1055-1646-13&P. 5. Perform the final inspection on the rocket pods in accordance with TM 9-1055-1646- 13&P. 6. Stencil the date of the load test on the cage. 7. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the HIMARS launcher and _____ _____ corrected any defects. 2. Positioned the HIMARS launcher. _____ _____ 3. Inspected the cables. _____ _____ 4. Performed a 125 percent load test. _____ _____ 5. Performed the final inspection on the rocket pods. _____ _____ 6. Stenciled the date of the load test on the cage. _____ _____ 7. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. 1 October 2014 3-97