MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download

Page 126 of 188

091-94P-1211 Perform Load Test DANGER Follow all Danger warning in TMs WARNING Follow all warning in TMs CAUTION Comply with all unit/shop SOPs Conditions: Perform this task in a operational environment given an M142 HIMARS launcher; DA Form 2404, Equipment Inspection and Maintenance Worksheet, one 94P HIMARS repairer; one 13M MLRS crewmember to assist as required; a 94P shop set; a 94P tool kit; two rocket pod test loads, black coating; TM 9-1055-1646-13&P; TM 9-243, and a DA Pamphlet 750-8, The Army Maintenance Management System (TAMMS) Users Manual. Note. The load test is performed either after repair or replacement of the hoist, the hoist cable, the hook and pulley assembly, the hoist carriage assembly, the booms, or it is performed annually. Note: This task may be performed in a Chemical, Biological, Radiological, and Nuclear (CBRN) environment. Standards: A load test is performed according to the applicable technical manuals. Perform this task without causing injury to self, other personnel, the environment, or damage to equipment. Special Condition: None Special Standards: None Special Equipment: Cue: None Note: None Performance Steps 1. Inspect the HIMARS launcher and correct any defects: a. Check bolts, nuts, and screws. b. Check bearings and bushings. c. Check components. d. Check hoses and fluid lines for damage. 3-96 1 October 2014