MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 122 of 188
2. Perform repair procedures on boom system in accordance with TM 9-1055-1646- 13&P. a. First, isolate the exact malfunction of the boom in accordance with TM 9-1055- 1646-13&P. b. Perform Boom system removal procedures in TM 9-1055-1646-13&P. 3. Remove the faulty component in accordance with TM 9-1055-1646-13&P. 4. Install the replacement component in accordance with TM 9-1055-1646-13&P. 5. Perform boom/hoist follow on procedures after repairing the boom/hoist system. 6. Verify the boom/hoist system is operational. 7. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the boom system and _____ _____ corrected any defects. 2. Performed repair procedures on boom system. _____ _____ 3. Removed the faulty component. _____ _____ 4. Installed the replacement component. _____ _____ 5. Performed boom/hoist follow on procedures. _____ _____ 6. Verified that the boom/hoist system was operational. _____ _____ 7. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References 3-92 1 October 2014