MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 120 of 188
Performance Measures GO NO-GO 6. Recorded the thickness of the shims on each stud. _____ _____ 7. Installed the shims replaced bad shims. _____ _____ 8. Positioned the pinion gear X-mark between the X-marks on _____ _____ The azimuth gear bearing. 9. Torque the nuts. _____ _____ 10. Performed backlash check. _____ _____ 11. Ensured that the pinion gear and gearing teeth were parallel. _____ _____ 12. Aligned the azimuth geared bearing X-marks with the X-marks _____ _____ on the base assembly. 13. Used the Maintenance Support Device (MSD) to ensure that _____ _____ system was operating properly. 14. Verified that the azimuth drive unit was operational. _____ _____ 15. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Form 2407 DA Pamphlet 750-8 TM 9-243 TM 9-1055-647-13&P Subject Area 4: Maintain the HIMARS 3-90 1 October 2014