MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 114 of 188
Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the hydraulic pump unit and _____ _____ corrected any defects. 2. Used the proper Interactive Electronic Technical Manual (IETM) _____ _____ using the SPORT and following the on screen prompts to perform maintenance procedures. 3. Removed the defective hydraulic pump unit. _____ _____ 4. Installed the replacement hydraulic pump unit without causing _____ _____ damage to the unit. 5. Connected the electrical cable W338. _____ _____ 6. Performed a hydraulic system status check after repairs were _____ _____ completed. 7. Cycled the M270A1 rocket launcher in azimuth and elevation. _____ _____ 8. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-243 TM 9-1055-647-13&P 3-84 1 October 2014