MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download

Page 107 of 188

STP 9-94P1-SM-TG 4. Re-checked the adjustments between the door and LP/C _____ _____ channel. 5. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2404 DA Pamphlet 750-8 TM 9-243 TM 9-1055-647-13&P TM 9-1425-648-13&P 091-94P-1164 1 October 2014 3-77