MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download

Page 104 of 188

5. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed Surveillance Inspections in accordance with _____ _____ Classification of Defects Check List. Access the Classification of Defects Check List by TM 9-1410-ATACMS-BAT, then clicking on the following Hot Spots: Ammunition TM 9-1410-644-40&P, ARMY TACMS Table of Contents. 2. Performed MCTD setup and power up procedures. _____ _____ 3. Performed MCTD W3 self test and test cable (W4, W5, or W6) _____ _____ self test for selected M/LPA. 4. Connected the MCTD to the M/LPA and perform Electronic _____ _____ Surveillance test on the M/LPA. 5. Completed maintenance forms, if required. _____ _____ Evaluation Guidance: Score the soldier GO if all performance measures are passed (P). Score the soldier NO-GO if any performance measure is failed (F). If the soldier fails any performance measure, show what was done wrong and how to do it correctly. References Required DA Form 2415 DA Pamphlet 750-8 SF FORM 364 SF FORM 368 TM 9-4935-1644-40&P 3-74 1 October 2014