MOS-94P Multiple Launch Rocket System (MLRS) Repairer M142 HIMARS Download
Page 101 of 188
STP 9-94P1-SM-TG a. W339P6 connector to reservoir J6 connector. b. W339P4 connector to reservoir J4 connector. c. W339P7 connector to reservoir J1 connector. d. W339P5 connector to reservoir J5 connector. e. W339P3 connector to reservoir J3 connector. f. W339P2 connector to reservoir J2 connector. 10. Bleed the hydraulic system. 11. Inspect Reservoir sight glass, and refill if needed. 12. Verify the hydraulic reservoir is operational. 13. Complete maintenance forms. Evaluation Preparation: Ensure all items required in the condition statement (or appropriate substitutions) are on hand and all safety requirements are met. Performance Measures GO NO-GO 1. Performed a visual inspection of the hydraulic reservoir and _____ _____ corrected any defects. 2. Disconnected electrical cables. _____ _____ 3. Disconnected hydraulic hoses. _____ _____ 4. Removed ground strap from reservoir. _____ _____ 5. Removed the damage hydraulic reservoir. _____ _____ 6. Installed ground strap to reservoir. _____ _____ 7. Installed the replacement hydraulic reservoir. _____ _____ 8. Connected the hydraulic hoses. _____ _____ 9. Connected electrical cables. _____ _____ 10. Bled the hydraulic system, if required. _____ _____ 11. Inspected Reservoir sight glass to ensure tub is filled. _____ _____ 12. Verified that the hydraulic reservoir was operational. _____ _____ 13. Completed maintenance forms, if required. _____ _____ 1 October 2014 3-71